Installation Instructions For Warp Feeding Device (1511 Type) Of Loom

Release:hnfzpj Click:9440

Installation instructions for the warp feeding device (1511 type) of the weaving machine:

When the Loom is in production, the warp yarn on the warp shaft is fed out by the warp feeding and tension adjustment mechanism. The warp delivery device is divided into inner warp delivery and outer warp delivery, which refers to whether the warp delivery device is located on the inner or outer side of the wall panel. In addition, according to the appearance of the warp delivery mechanism, it can be divided into vertical warp delivery and horizontal warp delivery, and according to the structural design, it can be further divided into mechanical warp delivery and electronic warp delivery.

I. Install friction serrated wheel axle B12 kit

1. First, install the serrated wheel axle bracket B26 on the inside of the wall panel P1, with the bracket shaft hole concentric with the circular hole, and tighten the nut behind the bracket. Insert the serrated wheel shaft and its accessories into the bracket shaft hole, fit the T-shaped joint bracket B29 kit on the outer shaft end of the wall panel, and slightly tighten the nut in front of the bracket;

2.將制動盤彈簧B61的一端穿入托架彈簧孔中,另一端套在制動盤B21的凸釘上,使制動盤凸嘴伸入鋸齒輪軸托架缺口內約3.2毫米(1/8吋),再將鋸齒輪緊圈緊定螺釘扳緊。在平裝時因不容易看清這個間距,一般以緊圈B42與鋸齒輪軸端相隔3.2毫米(1/8吋)來確定,如下圖所示;

Installation diagram of the delivery mechanism

3. Secure the side panel guide F5 on the shuttle changing side to the wall panel by threading bolts through the second hole behind the rocker arm bracket. The side panel guide should be bent backwards and positioned vertically, as shown in Figure 56;

Installation of pedal linkage and position of side plate guide rail

4. Thread the pedal connecting rod B59 through the hole on the upper part of the side plate guide frame, and screw the thread on its head end into the screw hole of the T-shaped joint B30. Insert the connecting rod bolt B51 into the hole of the foot bar B28, so that the line connecting the bottom surface of the foot bar is roughly horizontal, as shown in Figure 57. Check the upper, lower, front, and rear positions of the T-shaped joint bracket to ensure that it is in its normal position and does not collide with the friction serrated wheel axle after the foot bar is stepped on. Then tighten the nut in front of the bracket. If there is a collision, the upper and lower positions of the T-shaped joint bracket should be adjusted.

II.Installation and delivery of warp shaft B13

1. First, install the warp feed shaft bracket B3 on the inside of the shuttle changing side wall panel, and install the warp feed shaft (some weaving machines have two brackets, the other one is installed on the switch side wall panel). Then, install the warp feed shaft bracket B16 on the rear crossbar, and use a standard to determine the front and rear height position of the warp feed shaft. The vertical distance between the pedal shaft and the warp feed shaft is 58.7 millimeters, and the horizontal distance between the centers is 174.6 millimeters. During installation, the warp beam support bracket should be firmly seated on the wall panel;

2. Correct the center of the warp feed shaft to make it flexible; And recheck the front and rear positions as well as the horizontal condition of the warp axis,

III.There are two types of prayer wheels: long and short. Short shaft installation is relatively convenient, but the warp shaft is only driven by a single gear, which puts a lot of force on the gear. Therefore, it is better to use a set screw to fix the warp shaft disc edge on the warp shaft tube B15.

IV. Install accessories on the warp and side shafts

1. Install the large umbrella gear B31, umbrella gear B37, and tightening ring B18 in sequence on the side shaft, as shown in the following figure. Insert the side shaft into the rear bracket and the B19 shaft hole of the worm, and ensure that the tightening screw of the worm is aligned with the screw hole on the rear end of the side shaft. Tighten the tightening screw of the worm, and then tighten the tightening screw of the ring. The axial clearance of the side shaft is limited to about 0.8 millimeters.

Delivery side shaft and its accessories with delivery accessories

Worm gears can be divided into left and right rotation. In the warp delivery mechanism of the loom, the left-hand carriage uses a right-handed worm gear, while the right-hand carriage uses a left-handed worm gear. We must be meticulous in our work and not careless. If the two pairs of worm gears and worm gears of the left and right hand carts are mistakenly adjusted, the warp axis will reverse during the operation of the loom, making production impossible. The method to distinguish between left and right hand worm gears is: if the worm gear thread is consistent with the positive screw thread, it is a left-hand vehicle; On the contrary, it is a right-handed car. Additionally, it should be noted that the worm gear and worm wheel must be paired, otherwise they will not be able to mesh. The following figure shows a pair of worm gears and worm gears for a left-hand vehicle;

Diagram of the worm gear and worm wheel of the sending mechanism

2. Pull out the warp feed shaft from the bracket shaft hole, sequentially thread the tightening ring B8, the warp feed small gear B6, the worm wheel B5, and another tightening ring, and then insert them into the support stand. Align the warp feed shaft with the outer side of the bracket, and tighten the set screw of the tightening ring in the same direction as the keyway. Tighten the screw. It is advisable for the axial movement of the warp delivery shaft not to exceed 0.8mm. The set screw of the worm gear is in the inner gear of the loom, and the set screw of the small gear B6 is in the outer gear. Otherwise, it will affect the normal meshing between the small gear and the teeth of the warp shaft edge plate, and the set screw of the small gear cannot be tightened.

Insert the worm gear key into the keyway and use a hammer to drive the worm gear in, aligning it with the worm gear.

3. Fix the umbrella gear on the side shaft and the umbrella gear B36 on the serrated axle to mesh with each other. If the meshing is poor, the position of the serrated wheel axle bracket can be adjusted so that the centerline of the feed side shaft and the centerline of the saw gear are on the same horizontal plane.

4. Install the worm gear cover B66 and the umbrella gear cover B78 onto the side shaft rear bracket to prevent flying debris from falling in. The cover should not collide with the worm gear and bevel gear.

FriendLink: BaiDu  Ecer  Xinda Textile  Ec21  Ecplaza  Chinatexnet  
Copyright © 2016 Xinxiang City Xinda Textile Machinery Parts Co. Ltd 【MANAGE】
ADDRESS:5F West, Unit 53A, Zone A, Huicheng Port Bay, Huixian City, Henan Province,China CONTACT:Mr Yang MOBILE:86-15237383444
TEL:+86-0373-6235050 FAX:+86-0373-6235050 E-MAIL:309816745@qq.com
WEB:http://www.goqx.cn
SERVICE
TEL:0373-6235050
主站蜘蛛池模板: 亚洲AV永久在线观看更新| 日韩在线观看人成电影大全 | 日韩一级片视频热久久久| 日韩免费AV电影网址| 国产AV国内精品| 91精品电影香蕉牛奶| 91视频国产高清无码| 日皮网站精选视频| 91视频久久亚洲色图1| 成人性爱短片手机在线| 草草草在线播放韩日和二区| 日韩特黄毛片无遮挡免费手机播放| 日本极品黄色视频| 99热国品华人日韩AV无码片| 一级久久久久久女人18| 农村少妇特黄一级片| 插欧洲美女欧美精品欧美| 91精品国产无码91| 特级毛片电影播放| 国产一期二期在线观看| 亚洲一卡二卡精品无码视频| 高清另类无码第一色影院| 美国黄色一级A片免费视频播放| 久久色在线观看怡红院va| 成人免费无遮挡无码| 可以看的黄片天天插网站| 日韩人妻AV妞AV| 亚洲无码激情在线| 欧美一区二区成人小视频| 在线看av免费观看| 日韩无码久久久久久久久久久久久久| 久久青草天堂黄色毛片录像| 免费看一级A片在线黄网| 婷婷密臀五月天特片网AV| 找a级免费毛片看| 成人网站免费日韩高清| 中文字幕 自拍| 国语无码黄片美女特黄片| 免费看一级A片在线黄网| 我要看中国黄色一级片| 手机播放日韩AV|