草在线视频免费看_日韩激情久久久久久久_岛国网站在线观看_竹菊AV一区二区三区四区_日本欧美亚洲日本_香蕉视频久久人人操在线_国产成人a人亚洲v品无码_最新中文字幕av

86-15237383444
EXPLAIN

Installation Requirements And Standards For 1515 Loom Foot Thread

Release:hnfzpj Click:11380

The installation requirements and standards for the foundation wire of the 1515 weaving machine are the same as those of the 1511 type and GA615. We analyze the dimensions of the foundation wire at various levels through pictures, provide detailed installation instructions for the foundation wire, and also carefully describe the inspection methods after the foundation wire is installed. We are willing to learn and exchange ideas with colleagues in Guangzhou Textile.

A32 foundation screw for 1515 Shuttle Loom

The foot wire of the weaving machine is divided into two specifications.1515 Power Loom Foot screws, Loom Foot Screws, Loom Installation,The A32 in the above picture is a short foot wire used for the foot installation of the I54 weaving machine's fuse box support. The following picture shows the anchor wire A27 we used to fix the weaving machine wall panel:

Size of anchor bolts and anchor wires for weaving machines

The A27 bottom bolt of the weaving machine, also known as the anchor wire, can be used for various models of shuttle looms and rapier looms. The specific installation requirements and standards are: the anchor pit is in the shape of a circular cone, the side section is trapezoidal (as shown in the figure below), the screw of the anchor wire is based on a diameter of 12 millimeters, and the length of the anchor wire protruding from the ground is recommended to be 55-60 millimeters. The burial depth underground shall not be less than 150 millimeters. After burying the anchor wire, its verticality shall be checked, and the angle ruler shall be used to check if it is less than 1 millimeter. The difference in center distance between the four anchor wires shall also be controlled within 1mm.

Installation of foundation wire for 1515 Loom

In order to reduce the vibration of the 1515 machine during operation, prevent the wall panel foot from breaking, and ensure the smooth operation of the whole machine, the floor board needs to be in full contact with the wall panel foot, and the nut of the foot wire also needs to be locked. After adjusting the pedal shaft and tightening the foot screws, use a 0.2mm micrometer to insert and test around the upper and lower sides of the foot board (the upper plane of the floor board). The insertion depth should be less than 6mm, and the width should be less than 13mm on the top and 25mm on the bottom. Please use this standard for judgment. If it does not meet this industry standard, the floor board needs to be corrected again. Please refer to the previous chapter for details on the steps.

FriendLink: BaiDu  Ecer  Xinda Textile  Ec21  Ecplaza  Chinatexnet  
Copyright © 2016 Xinxiang City Xinda Textile Machinery Parts Co. Ltd 【MANAGE】
ADDRESS:5F West, Unit 53A, Zone A, Huicheng Port Bay, Huixian City, Henan Province,China CONTACT:Mr Yang MOBILE:86-15237383444
TEL:+86-0373-6235050 FAX:+86-0373-6235050 E-MAIL:309816745@qq.com
WEB:http://www.goqx.cn
SERVICE
TEL:0373-6235050
主站蜘蛛池模板: 狠狠色狠狠干欧美亚州性爱| 成人三级视频成人三级影片| 特黄一级免费亚洲无码网址| 久久成人电影久草色视频| 四季AV日韩精品一区| 久久免费精品国产A视频| 黄色录相AA片视频播放| 不产美女私密处国产美女私密处| 激情小说自拍偷拍中文字幕高清无码| 中文字幕黄色片久久蜜久| 在线观看国产黄色大片| 欧洲亚洲日韩国模吧视频精品 | 资源站一区二区极品色情网| 国产中文字幕网| 操国产在线看草成人av| 亚洲成人电影在线免费看| 岛国一级A片香蕉成人AV| 中国黄色电影免费在线观看| 中文字幕无码人妻三区| 天天爱天天做天天大综合| 欧美丝袜性爱在线播放| 国产一区二区三区免费无码在线看| 人人爱人人插人人摸| 亚洲伊人AV嫩草| 91超碰人人摸色丁香伊人| 人人操人人摸人人干人人爱| 亚洲免费A级无码电影性爱| 亚州激情播放三级片网站多少| 综合色图AV在线| 日韩有码无码人妻中文字幕| 久操视频免费网亚洲人人操 | 日韩一级免费毛片| 性性性性性性国产| 成人黄色完整欧美亚洲v| 亚洲精品国产偷拍公开超碰在线 | 免费试看三级片久草在| 欧美久久电影色色开心激情网| 色情毛片视频日韩激情无码啊 | 日本成人在线成人| 日韩少妇无码国产AⅤ| 亚洲A片亚洲亚洲日韩大色|